Client
Ceylon Petroleum Corporation (CPC)
Supplier
Mermaid Solutions Pvt Ltd
Location
Colombo, Sri Lanka
Project Date
2024
Project Overview
Mermaid Solutions Pvt Ltd was entrusted with the critical task of repairing an engine driven fire pump for the Ceylon Petroleum Corporation (CPC). This specialized project involved comprehensive diagnostics, repair, and testing of the fire pump, ensuring optimal operational efficiency for fire safety systems at the CPC refinery.

Project Scope
- Detailed inspection and fault identification of the engine-driven fire pump.
- Full dismantling and repair of the engine components.
- Replacement of worn-out parts and reconditioning of critical components.
- Performance testing and certification to meet CPC’s safety standards.
Key Deliverables
- Engine repair and performance optimization.
- Complete functionality restoration of the fire pump system.
- Final testing and commissioning under CPC supervision.
- Compliance with fire safety regulations and operational standards.

Value Addition
The project aimed to restore the fire safety system’s full operational readiness, ensuring CPC’s facility maintains high safety standards. This repair extended the lifespan of the equipment and avoided costly replacements while ensuring compliance with industry standards for fire protection systems.
Completion Status
The project was successfully completed with the fire pump restored to full operational capacity, meeting all performance and safety benchmarks set by CPC.
Contact
Mermaid Solutions Pvt Ltd
No. 73, MJC Fernando Mawatha, Idama, Moratuwa, Sri Lanka
Email: info@mermaidsolution.com
Tel: +94 11 2332323